Outbuilding · climate · structural · HVAC

Shed

Outbuilding ledger — storage, structural maintenance, HVAC, electrical, organization. First record: AC / heat-pump installation planning (single-zone ductless mini-split needed for year-round comfort, equipment protection, and reducing ambient humidity that ages stored items faster).

Single-zone ductless mini-split · inverter · pre-charged · self-install kit · Amazon-sourced
⚠ Planning · install pending
Stub record opened 21 May 2026. Target product: Amazon-sourced inverter ductless mini-split heat pump (pre-charged refrigerant, wall remote, self-install). Drives temperature regulation + humidity reduction in the shed — critical for stored equipment longevity (electronics, motors, fabrics, paint, fertilizer chemistry). BTU sizing + install requirements TBD.
New dedicated feed from the house to the shed · underground route · 40 A 4-wire circuit
⚠ Planning · seeking electrician
Opened 9 Sep 2026. Plotting the power run: the proposed underground route (four site photos), the load & circuit spec, permits, and session notes. Per Joel (9 Sep 2026), the existing three-wire feed is insufficient for a 4-wire shed panel — a 40 A circuit is needed. Feeds the mini-split; same trade as the gate-power trench.
Main floor plan 1/3
14×18 New England Barn — the finalised design (SoftPlan · John H. · 20 Jul 2026): main-floor plan, cross-section and elevations · plus the earlier 14×20 study and the 6279 Greenhill Road site survey
📐 Reference · finalised 14×18 drawings + source PDFs
Captured 21 May 2026 via dropzone; preview images added 22 May 2026; 14×18 design + site survey added 9 Sep 2026; finalised 14×18 drawings set as the click-through hero 9 Sep 2026. Inline previews (the rotator above cycles them): main-floor plan · cross-section · elevations. Source PDFs: drawings-plans.pdf (858 KB) · plan-view.pdf (210 KB) · 14×18 elevations (2.1 MB) · 6279 Greenhill Rd survey (1.5 MB). Reference for AC install routing, electrical run planning, and future structural maintenance decisions.